APPSC Group-I Prelims 2024 — Paper-II (General Aptitude) · Q 68
Indian Renewable Energy Development Agency Ltd (IREDA) has signed a Memorandum of Understanding (MOU) for innovation and research in the renewable energy sector with :
- (a) IIT Bhubaneswar
- (b) IIT Bombay
- (c) IIT Madras
- (d) IIT Guwahati
Official APPSC answer: (a)
Solution: The answer is (A): IREDA's MoU for innovation and research in renewable energy was signed with IIT Bhubaneswar, which is why it alone is keyed correct. Option-by-option analysis • ✅ (A) — IREDA (Indian Renewable Energy Development Agency Ltd), a CPSE under the Ministry of New and Renewable Energy, signed a Memorandum of Understanding with IIT Bhubaneswar for collaborative innovation and research in the renewable energy sector. This is the officially keyed pairing. • ❌ (B) — IIT Bombay is a genuine centre of solar research — it hosts the National Centre for Photovoltaic Research and Education (NCPRE) — but it is not the institute named in this IREDA MoU. The presence of a strong solar-research institute makes this a classic look-alike distractor. • ❌ (C) — IIT Madras is India's top-ranked institute and home to the country's first IIT Research Park, with deep work in energy systems. Str…
APPSC Group-I Prelims 2024 — Paper-II (General Aptitude) · Q 90
Consider the following statements :
Statement I : India has tremendous Solar power generation potential.
Statement II : India experiences clear sunny weather for 250 to 300 days per year and this exposure to the Sun is estimated to be worth 5000 Tn kilowatt hour of energy in a year over India's land area.
Select the correct answer using the codes given below :
- (a) Statement I and Statement II are correct, but Statement II is not the correct explanation for Statement I.
- (b) Statement I and Statement II are correct and Statement II is the correct explanation for Statement I.
- (c) Statement I is incorrect, but Statement II is correct.
- (d) Statement I is correct, but Statement II is incorrect.
Official APPSC answer: (b)
Solution: The answer is (B): both statements are correct, and Statement II is the correct explanation of Statement I, because India's 250–300 clear sunny days and the roughly 5,000 trillion kWh of solar energy received over its land area are exactly what give India its tremendous solar generation potential. Statement-by-statement analysis • ✅ Statement I — India lies in the tropical and sub-tropical belt, roughly between 8°N and 37°N, so it receives strong solar radiation of about 4–7 kWh per square metre per day. The Ministry of New and Renewable Energy (MNRE) estimates India's solar power potential at about 748–750 GW — far beyond what we can use today. So the claim of 'tremendous potential' is factually sound. • ✅ Statement II — India enjoys clear sunny weather for about 250–300 days a year, thanks to a largely cloud-free climate for most of the year, especially the dry winter and summer mon…
APPSC Group-I Prelims 2022 — Paper-II (General Aptitude) · Q 67
Consider the following statements regarding the Indian Renewable Energy Development Agency Limited (IREDA):
I. It is a Navratna Enterprise of Government of India.
II. It aims to give financial support to schemes for generating electricity through new and renewable sources and conserving energy through energy efficiency.
III. It works directly under the administrative control of the Ministry of New and Renewable Energy (MNRE).
Which of the statements given above is/are correct?
- (a) I and III only
- (b) II and III only
- (c) I, II and III
- (d) I and II only
Official APPSC answer: (b)
Solution: The answer is (B): only statements II and III are correct, because in 2022 IREDA was still a Mini Ratna—not a Navratna—while its renewable-energy financing mandate and its place under MNRE are both true. Statement-by-statement analysis • ❌ I — At the time of the 2022 exam, IREDA was a Mini Ratna (Category-I) CPSE, not a Navratna. Navratna is a higher category of Central Public Sector Enterprises with greater financial autonomy. IREDA was granted Navratna status only in April 2023, after this exam. • ✅ II — IREDA's core mandate is to provide financial assistance for projects that generate electricity from new and renewable sources—solar, wind, small hydro, biomass—and for energy-efficiency and conservation schemes. This matches its charter as a non-banking financial company under MNRE. • ✅ III — IREDA is a CPSE under the administrative control of the Ministry of New and Renewable Energ…
APPSC Group-I Screening Test 2016 (Notification 36/2016) — General Studies & Mental Ability · Q 62
What is the capacity of solar power sought to be installed in India by 2022 under the Jawaharlal Nehru National Solar Mission ?
- (a) 10 Gigawatt
- (b) 50 Gigawatt
- (c) 100 Gigawatt
- (d) 1000 Gigawatt
Official APPSC answer: (c)
Solution: The answer is (C): the Jawaharlal Nehru National Solar Mission's 2022 solar-capacity target was revised to 100 Gigawatt, split as 60 GW utility-scale and 40 GW rooftop solar. Option-by-option analysis • ❌ (A) — 10 Gigawatt is far too low. Even the original JNNSM target, set when the mission was launched on 11 January 2010, was 20 GW by 2022. So 10 GW cannot be the mission's sought capacity. • ❌ (B) — 50 Gigawatt was never the official JNNSM target. It may look plausible because the revised 100 GW target was split into 60 GW utility-scale and 40 GW rooftop solar, but 50 GW itself is not the mission figure. • ✅ (C) — In 2015 the Government revised the JNNSM target to 100 Gigawatt of grid-connected solar capacity by 2022. This 100 GW was to come from 60 GW of large utility-scale solar plants and 40 GW of rooftop solar. Therefore 100 Gigawatt is the keyed and correct answer. • ❌ (D) — 100…